- Shorter approval time
- 46.1%
- Shorter post-approval handoff time
- 78.1%
- Plans in the program
- 90
The Challenge
The program involved plan owners, reviewers, approvers, and the teams receiving the final documents. Work had to move through several handoffs while meeting review and approval requirements.
The earlier cycle averaged 16.7 days in approval and a further 15.1 days in the post-approval handoff between departments and senior leaders. Those waits extended the time before approved plans reached the teams that needed them.
The Work
I coordinated more than 200 stakeholders across 88 country plans, one global plan, and one enterprise plan.
- Reviewed the approval workflow, quality review, and distribution process to identify gaps in how work moved.
- Clarified responsibilities, review steps, and follow-up from draft through approval and distribution.
- Introduced a more structured working cadence and communications for each stage of the process.
- Monitored progress, coordinated cross-department handoffs, and used process audits to refine execution.
The Results
The reported 2026 program measures improved across approval, post-approval handoff, and overall turnaround.
Program Measures Before And After The Redesign| Measure | 2025 | 2026 | Change |
|---|
| Average approval time | 16.7 days | 9.0 days | 46.1% shorter |
|---|
| Average post-approval handoff time | 15.1 days | 3.3 days | 78.1% shorter |
|---|
| Average overall turnaround through quality review, approval, and distribution | 41.4 days | 36.6 days | 11.6% shorter |
|---|
The comparison uses reported 2025 and 2026 program metrics. These figures measure elapsed process time and reflect this program’s results.
Explore Fractional COO Support- Variation records profiled in an out-of-stock export
- 20,159
- Variations checked online
- 40
- Product pages included in those checks
- 7
The Challenge
The owner wanted only a selected assortment offered online, but customers could still reach other products. During discovery, the owner reported three affected orders in one particular week and said uncertainty about availability was limiting website promotion.
The review needed to distinguish which products were intended for online sale from whether stock was recorded for a particular variation. Those questions required different evidence and different corrective decisions.
The Work
- Profiled an out-of-stock export containing 20,159 variation records.
- Checked 40 variations across seven live product pages, reviewing availability labels and selection controls.
- Traced a reviewed product through website search, Square settings, variation selection, and store-pickup controls.
- Documented the confirmed finding and prepared a prioritized improvement roadmap and next-step scope.
What The Assessment Found
All 40 out-of-stock variations checked online were labeled out of stock and disabled in the variation selector. That finding applied to the checked set; it did not establish the condition of the entire catalog or a physical inventory count.
Separately, a reviewed product outside the owner’s intended online assortment remained discoverable through on-site search. Its website assignment was active and its browsing and search restriction was off. Selecting a reviewed variation and store pickup enabled Add to Cart. No checkout or live order was submitted.
Recommended Next Steps
- Confirm which products the owner wants available online.
- Correct website assignments and browsing and search settings, then check search results and known direct links.
- Assign responsibility for keeping online product availability accurate and verify approved changes.
What The Assessment Produced
The assessment produced documented findings, a prioritized improvement roadmap, and a proposed next-step scope. These give the owner a clear basis for deciding which corrections to approve.
Implementation and post-change measurement are a separate phase. The outcome documented here is the assessment and recommended next steps.
The three affected orders were reported by the owner for one week. Sales, savings, and error reductions have not been quantified.